Manage
Production planning
The planner uploads the plan, operations approves it, and each machine's weekly load shows planned production against breakdowns.
Plan in use
–
No approved upload yet
Waiting for approval
None
Nothing to decide
Machine-weeks over capacity
0
Planned + breakdown hours above 168 h
Average repair time
–
Last 4 weeks, used for open stops
Weekly machine load
Planned batch hours plus breakdown hours (open stops, then the 4-week average), as a share of 168 hours. This is the figure S&OP reads back.
0 machines
No planned production or breakdowns in the next 4 weeks.
Plan versions
Each upload is kept, with who approved or rejected it.
No plan uploaded yet.